Description of works Rock excavation, transportation, and slope cutting.Backfilling – compacting the roadbed. Project details: Contractor : ALBSTAR shpkSubcontractor: DEHA 2010 shpkTimeline : 2018-2020 Previous Post Asphalting of the Velmishi - Rroskovec road Next Post The road of Vlora River, Lot 3